Curbing Installation
Ground Preparation is done using a small trenching machine and shovels. The trench is 2" deep and 10" wide.
Mixing is done on-site with a self contained trailer and mixer. Color is added to the mix at this point.
Laying the curb in a continuous landscape border. Slip forms are attached to produce the desired
style
or form.
Finishing the curb with a hand trowel. Control joints are placed every 3 feet to minimize cracking. The desired
pattern
is applied at this time.
Sealing brings the color to life and protects the curbing.